[PRNewswire] LONGi sets solar industry record for R&D spending, according to

입력 2018-04-12 09:33  

[PRNewswire] LONGi sets solar industry record for R&D spending, according to
PV Tech

(XI'AN, China, April 11, 2018 PRNewswire=연합뉴스) Recently, PV Tech released an article about leading integrated high-efficiency monocrystalline module manufacturer and 'Silicon Module Super League' (SMSL) member [https://www.pv-tech.org/editors-blog/top-10-module-suppliers-in-2017 ] LONGi Green Energy Technology. LONGi set a new solar industry R&D expenditure record in 2017, not only surpassing the two historical leaders, First Solar and SunPower, but also spending more in one year than any PV manufacturer to date.

According to LONGi's recently released 2017 annual financial report, total R&D expenditure in 2017 almost doubled to RMB 1.1 billion (US$175.7 million), up 96.67% from US$89.2 million in 2016.

LONGi reported total revenue of RMB 16.362 billion (US$2.59 billion) in 2017, up almost 42% from the previous year. Therefore, R&D spending accounted for 6.77% of revenue in 2017.

According to PV Tech's long-standing analysis of R&D spending [https://www.pv-tech.org/editors-blog/10-years-of-rd-spending-analysis-of-12-key-pv-module-manufacturers ] of leading PV module manufacturers, only SunPower has come close to LONGi's level when, in 2015, R&D spending accounted for 6% of revenue and First Solar topped 5.1% in 2011.

However, one of the key metrics is that LONGi surpassed perennial top ranked R&D spenders, First Solar and SunPower, respectively, by a significant margin. Both companies cut R&D spending in 2017, the first time for SunPower in four years, while First Solar trimmed R&D spending for the third consecutive year.

In contrast, LONGi has increased R&D spending for six years in a row and has maintained a high-level of R&D investment over the last four years.

Initially, LONGi was a dedicated monocrystalline ingot and wafer producer, but in 2015, the company started producing monocrystalline solar cells and modules. Focused on high-efficiency PERC (Passivated Emitter Rear Cell) technology, R&D spending almost doubled each year after 2016.

However, in reporting R&D expenditure of US$175.7 million, LONGi also set a new annual solar industry spending record, according to PV Tech's analysis.

First Solar had previously held the record at US$143.9 million, set in 2014. First Solar remains the leader in R&D spending on a cumulative basis, reaching over US$1.11 billion between 2007 and 2017.

SunPower remains second ranked at over US$663 million in the same time period. However, LONGi has jumped ahead of several other PV manufacturers to take the third ranked position with over US$390 million in cumulative R&D spending since 2012.

Original PV Tech article can be found at: https://www.pv-tech.org/news/longi-sets-solar-industry-record-for-rd-spending

Photo - https://photos.prnasia.com/prnh/20180411/2102116-1
LONGi Green Energy Technology set a new solar industry R&D expenditure record in 2017, not only surpassing the two historical leaders, First Solar and SunPower, but spent more in one year than any PV manufacturer to date.

Source: LONGi Solar

[편집자 주] 본고는 자료 제공사에서 제공한 것으로, 연합뉴스는 내용에 대해 어떠한 편집도 하지 않았음을 밝혀 드립니다.
(끝)


<저작권자(c) 연합뉴스, 무단 전재-재배포 금지>

관련뉴스

    top
    • 마이핀
    • 와우캐시
    • 고객센터
    • 페이스 북
    • 유튜브
    • 카카오페이지

    마이핀

    와우캐시

    와우넷에서 실제 현금과
    동일하게 사용되는 사이버머니
    캐시충전
    서비스 상품
    월정액 서비스
    GOLD 한국경제 TV 실시간 방송
    GOLD PLUS 골드서비스 + VOD 주식강좌
    파트너 방송 파트너방송 + 녹화방송 + 회원전용게시판
    +SMS증권정보 + 골드플러스 서비스

    고객센터

    강연회·행사 더보기

    7일간 등록된 일정이 없습니다.

    이벤트

    7일간 등록된 일정이 없습니다.

    공지사항 더보기

    open
    핀(구독)!